Print & Media Guide
Every material below is 100% PVC-free. The differences are surface, handling, the ink technologies it is typically run with, and what happens when the graphic comes down.
We manufacture the media; your print provider runs it on their own press with their own inks. Always confirm a profile with a sample before a production run.

Selection guide
| Material | Best for | Surface | Typical inks | Environment | Coming down |
|---|---|---|---|---|---|
| Peel and Stick | Reversible feature walls, pop-ups, retail seasons, offices in use | Self-adhesive, repositionable | Latex, UV, eco-solvent | Interior | Lifts and re-sets during install; strips without paste residue |
| Clay-Coated | Photographic murals, artwork reproduction, brand colour walls | Coated paper, smooth | Latex, UV, eco-solvent | Interior | Pasted install; strips as paper stock |
| Smooth, Nonwoven | Hospitality and commercial interiors, large wall areas | Nonwoven, dimensionally stable | Latex, UV, eco-solvent | Interior, higher traffic | Designed to strip cleanly at refresh |
| Fabrics | Backlit lightboxes, tension frames, soft signage, hanging banners | Woven and knitted textile | Latex, UV, dye-sublimation depending on construction | Interior, events | Folds, ships and reuses across a campaign |
| Graphic Display Board & Signage | Counters, plinths, headers, POS units, cut shapes | Rigid, paper-based board | UV flatbed | Interior, short to medium life | Recycles with paper and board waste |
Widths, weights, core sizes and roll lengths are issued per product on the current spec sheet — ask us and we will send it with your samples.
Before a production run
- Print a strip with your normal profile and one step down in ink limit — PVC-free coatings often need less ink than vinyl for the same density.
- Check dry-down after 24 hours, not after ten minutes.
- If the job is laminated, laminate the test strip too; most surprises appear there.
- Approve the hardest part of the image — the darkest area or the finest type.
- Keep the strip as your internal reference for the next job.
- Ask for a fire performance statement covering the finished assembly if the project requires one.
Speak with Our Team
Tell us about your project and we will contact you within 3-4 business days.

